OpenProject total cost calculator

Estimate OpenProject costs from edition features, active usage, project history, integrations, migration fidelity and ongoing operating scope.

Last updated

In short

  • User count and concurrent work are different sizing inputs.
  • Enterprise features can require upstream subscriptions on your own servers.
  • Project data imports do not automatically recreate planning logic or reporting.
On this page (5)

Costs and savings · Part of OpenProject

Interactive worksheet · no sign-up

Estimate OpenProject project management costs

Use the same currency and scope for both options. Inputs stay in this page; they are not included in analytics or sent with an enquiry.

1. Your current bill
2. The replacement

Business management: CHF 1,590/month for up to 3 apps; onboarding from CHF 9,900. Infrastructure and paid licences are extra.

Additional billable backup storage

Include copies and retention. Enter only costs outside the infrastructure quote and Pilae plan.

Match portfolios, resource management, agile workflows and permissions. Migration effort includes rebuilding workflows, not only importing tasks.

3. Transition and overlap
Optional: value internal operating time

Time released is capacity, not automatically payroll or cash saved. Keep time already billed by Pilae or another supplier out of these fields.

How the calculation works
  1. Current monthly invoices = billed units × unit price + additional current spend.
  2. Replacement monthly invoices = Pilae management + additional infrastructure + target licences + workload usage + retained services.
  3. Transition = plan onboarding + new hardware + extra migration + training + parallel months × max(0, current invoices − retained services). Parallel months are capped at the comparison horizon.
  4. Total invoices = monthly invoices × horizon, plus transition for the replacement. Payback uses the full transition commitment divided by positive monthly invoice saving, including all entered overlap months even beyond the selected horizon.
  5. Economic saving adds the change in valued internal operating time. It does not assume headcount reduction.

Business includes up to 3 apps, then a published per-app fee (CHF 390 in CHF). Starter’s published CHF price is CHF 449/month. All Pilae figures come from the same price data as the pricing page. Workload inputs are your estimates, not supplier quotes. Taxes, price growth, discount rates, opportunity costs and differences in functionality are outside this arithmetic.

OpenProject total cost depends on the planning work it must support, the required edition and the effort to move existing projects. A smaller licence bill is useful only if teams can still plan, report and collaborate as required. The live calculator combines costs; a project sample establishes functional fit.

Map the planning requirements

Requirement Evidence to collect Budget effect
User roles Active contributors, viewers and external participants Licence and access model
Concurrent work Busy meetings and reporting periods Application capacity
Planning behavior Dependencies, baselines, calendars and scheduling needs Edition and redesign
Documents Attachments and linked systems Storage and integration
Reporting Portfolio views, exports and custom fields Feature fit and rebuilding
History Comments, changes and closed projects Migration and retention

The OpenProject pricing comparison distinguishes Community and Enterprise capabilities. Self-hosting does not make all enterprise features free. Obtain the applicable quote and user-count rules rather than assuming the displayed entry price covers the intended deployment.

Size the workload, not the company

System requirements provide a reference, with concurrency and usage affecting the necessary resources. A thousand registered accounts do not imply a thousand simultaneous editors. Conversely, a smaller team can generate intense work during planning sessions and reporting deadlines.

Inventory attachment storage and the database, then add backups, temporary migration copies and operating headroom. If the service integrates with file collaboration or identity, those systems have their own cost and availability boundaries.

Model migration as workflow conversion

A list of tasks is only part of a project. Dates may depend on calendars, dependencies or manually maintained conventions. Custom fields and report definitions can be as important as the records themselves. Select one active project, one completed project and one complex planning example before estimating the rest.

For a hypothetical estate of twenty projects, eighteen may import with straightforward mapping while two require rebuilding specialist reports. Estimating every project at the easy-project rate hides that work. These are example categories, not measured migration effort.

Compare the resulting business schedule, ownership, permissions and reports. A matching task count is useful reconciliation, but does not prove that dependency logic or external access survived.

Keep licence savings separate from transition

Use the actual source subscription and renewal date. Include retained tools when a project team still needs a specialist scheduler, integration or reporting product. Add training, templates, parallel operation and internal ownership of the rollout.

The recurring difference may be positive while first-year cash is negative because of setup. The calculator should show both. Released administrative time is capacity value unless an identifiable invoice or staffing expense ends. Do not assign a blanket productivity percentage to a change of project-management tool.

Define the operated service

Use Pilae pricing for the service basis and confirm the app edition, infrastructure and integration scope separately. Identify who maintains project templates and custom fields versus who patches the runtime, monitors jobs and restores data.

Before relying on the service, test backup recovery of the database, files and required configuration in isolation. Rehearse upgrades with representative projects and document the return path before incompatible changes. Confirm access for a contributor, an external user and someone who should be denied.

For product selection, compare Plane and OpenProject. The Microsoft Project migration and Asana migration have different source constraints. Bring a project sample and the current contract so that the economic decision follows the actual work.

Sources and further reading

Use the linked documentation to confirm the version, edition and contract that apply to your project.

Review our project platform budget

Bring your current bill, required capabilities and workload assumptions. We will separate recurring operation from migration and retained services.